Risk Allocation for Economic Losses from Coronavirus Disease 2019

Coronavirus Disease 2019 (COVID-19) is causing unprecedented disruptions to the U.S. economy. Government officials and health professionals are predicting that these disruptions could continue through September. Businesses are having to face the challenges of operating remotely; many are cancelling non-essential travel – hampering long-planned meetings and conventions. Global supply chains are impeded as countries work to contain COVID-19’s spread.

While economic considerations are secondary to the protection of human health, they should not be ignored. Companies often allocate the risk for unanticipated business interruptions through their contracts and insurance policies. Whether you are considering recovery options or are defending against breach of contract claims, there are some important legal concepts to consider.

Force Majeure

We covered force majeure in a March 3 GT Alert, “Coronavirus and Force Majeure Contract Clauses.”

Force majeure is a common feature of contracts under common law legal systems. If you are evaluating a claim, or a counter-party is claiming that they may suspend performance or terminate the contract based on an event of force majeure, consider the following questions:

  1. Is there a contractual force majeure provision?
  2. What performance under the contract does the provision apply to?
  3. Has a listed event of force majeure occurred (in whole or in part)?
  4. Was the event beyond the reasonable control of the claiming party or without fault of the claiming party?
  5. Was the event unanticipated or reasonably unforeseeable?
  6. What specific factors prevent or materially delay/impact performance?
  7. If the contract is governed by a civil law system, do any civil code provisions address force majeure?
  8. Has your local jurisdiction implemented restrictions on travel, large gatherings, or imposed quarantines?

Resolution of these questions with respect to COVID-19 will be fact-specific and highly dependent on contractual wording. Decreased demand, higher production costs, or other purely economic factors typically do not constitute an event of force majeure. There must be a performance that has been prevented by a qualifying force majeure event. It has not yet been determined if government imposed closures, labor shortages, or lack of parts or components due to the virus will qualify.

Frustration of Purpose

In the United States and other common law jurisdictions, the doctrine of frustration of purpose is a cousin to the concept of force majeure, but does not require specific contractual language. The doctrine of frustration of purpose applies when a party’s principal purpose in entering a contract is substantially frustrated (without the fault of the party making the claim) by the occurrence of an event the parties had assumed would not occur at the time the contract was made.

Perhaps the most famous case involving the concept of frustration of purpose is Krell v. Henry. In that 1903 English case, an apartment was rented for the purpose of watching the king’s coronation. When the king fell ill and the coronation did not occur as planned, the tenant sought to cancel his performance under the contract. The landlord objected, stating that the obligation to rent the apartment was a binding obligation, whether or not the coronation occurred. The court agreed with the tenant, finding that where a contract had been made for a specific purpose and that purpose could not be carried out due to an unforeseen event without the fault of the tenant, the tenant should be relieved of the contract. Notably, the purpose at issue must be known to the counter-party but may not need to be stated in the contract itself. In Krell, all parties knew that the apartment was ideally suited for the purpose of viewing the coronation, and the purpose had been discussed at the time the lease was made.

Whether this doctrine applies to business interruptions due to COVID-19 will depend on a close factual examination of the circumstances as well as the contract itself. The law governing the contract will also need to be examined to determine whether frustration of purpose is conceptually available. There are numerous theoretical applications of this concept. For example, where a specific order for goods or services is tied to a particular event and the contract identifies the quantity, the product, and the timing of delivery but does not state the purpose of the purchase however it is fairly evident to both parties, the contract may have been frustrated.

Like force majeure, frustration of purpose is often not the preferred method for breaking a contract because the circumstances where these concepts may apply are fairly narrow. However, given the unprecedented nature of the current COVID-19 situation, an uptick in these types of claims seems likely.

Impossibility vs. Impracticability

Under early common law, the doctrine of impossibility excused the nonperformance of duties under a contract, based on a change in circumstances that makes performance of the contract literally impossible (i.e., the destruction of a theater makes the performance within the venue impossible). However, modern contract law along with and the Uniform Commercial Code (U.C.C.) have evolved the view of the impossibility doctrine as more of impracticability, meaning that now, literal impossibility may no longer be required.

Impracticability has been argued in many ways. At the core of many arguments is that the party should be excused of his or her responsibilities because performance has been made exceptionally and unreasonably burdensome, or impracticable by a catastrophic unforeseen event (i.e., such extraordinary performance to comply with the terms of the contract was not contemplated by the parties at the time the contract was made), and that such event was not caused by the party seeking to be excused. The catastrophic event must be unforeseeable (but not unimaginable), meaning that it was so unlikely that a reasonable party would not have drafted provisions in the contract when it was written to address it.

Compliance With All Laws Clauses

“Compliance with all laws” clauses are typically contained in contracts and provide that “each party agrees to comply with all laws, statutes, rules and regulations” relating to their duties under the contract. While this type of language is typically not considered a “big deal,” because people often think, “of course, I will follow the law,” such provisions may be beneficial when: (i) determining what the law requires in terms of performance of a party; (ii) or excusing future performance if doing so would be illegal or impermissible under any laws, statutes, rules, and regulations (e.g., laws prohibiting the sale of certain products or regulations preventing large group gatherings due to safety and health concerns). As such, parties should also consider the local, city, state, county, and federal laws that may dictate performance in conjunction with the parties’ contractual obligations.

Looking Ahead

  • Understand and evaluate your individual facts and circumstances.
  • Monitor the situation – in real time. The current situation is fluid, meaning facts and circumstances can change quickly, and often do.
  • Know what your contracts say, and understand the implications of your decisions. Review before you act.
  • Look at the local laws (federal, state, and city) to determine if they affect how you proceed with your performance.
  • Keep detailed records that include the scope of the interruption to your business, and detail the factors that you may rely upon for potentially excusing your performance.
  • Review your insurance coverages.
  • Consider whether there are alternative means to perform contractual obligations.
  • Consider business solutions to legal issues, such as a mutual agreement to move your event or obligation to a time after the crisis is over, or a negotiated resolution.
©2020 Greenberg Traurig, LLP. All rights reserved.

TRENDING LEGAL ANALYSIS


About this Author

Bryan X. Grimaldi Of Counsel Government Law & Policy Hospitality Public-Private Partnerships (P3) Government Contracts Marketing, Advertising, Sweepstakes & Promotions Law Sports Law
Of Counsel

Bryan Grimaldi counsels corporate clients, trade associations, destination marketing organizations, and public-private partnerships (P3) nationwide providing industry-specific, cost effective, outside counsel services, operational consulting, and advocacy. With deep knowledge of politics and the ability to navigate complex issues in dynamic environments, Bryan provides clients a unique perspective on how to deftly handle making an organization successful and bridge the gap between business goals and legal issues, among multiple constituencies.

Bryan develops tailored strategies for...

212-801-9337
Shareholder

Michelle D. Gambino is a first-chair trial attorney with a diverse practice focusing on highly sophisticated and complex commercial litigation matters with an emphasis in business, employment, construction, real estate and financial services disputes.

Michelle is highly regarded among her fellow colleagues, clients, and others in the legal industry. She is known for her personal and professional commitment to get things done in the best interests of her clients and is known as a “pit-bull” in the courthouse by her adversaries. Michelle is routinely selected to represent some of the most diverse clients in “bet-the-company” type disputes and/or in highly publicized matters. In addition to working with a broad client base, she works on both sides of the docket in state and federal courts, at both trial court and appellate levels.

703-749-1380
Thomas G. Allen Litigation Attorney Greenberg Traurig Law Firm
Shareholder

Thomas G. Allen is a litigator, focusing his practice on international arbitration and cross-border disputes. He represents clients in a variety of industries with an emphasis on energy, manufacturing, construction, and aviation. Thomas has wide-ranging experience in high-value international and U.S. arbitrations. He also litigates the enforceability of arbitration clauses and arbitration awards in U.S. Courts. Thomas is a frequent lecturer on international arbitration topics and is a former adjunct professor in the international arbitration discipline. Before concentrating on...

202-331-3139
Alan Sutin, Greenberg Traurig Law Firm, New York, Intellectual Property Law Attorney
Shareholder

Alan N. Sutin is Chair of the firm's Technology, Media & Telecommunications Practice and Senior Chair of the Global Intellectual Property & Technology Practice. An experienced business lawyer with a principal focus on commercial transactions with significant intellectual property and technology issues and privacy and cybersecurity matters.  He advises clients in connection with transactions involving the development, acquisition, disposition and commercial exploitation of intellectual property with an emphasis on technology-related products and services, and...

212-801-9286